
Full Big Band
20 musicians · Technical rider & stage plan
Planning edition · Final setup confirmed during production advance.
13 horns 32 inputs 11 monitor mixes incl. IEMs
01Stage plot
Clear, usable stage area. Allow additional space for PA stacks, wings and access. Stage deck height is above the audience floor; trumpet-riser dimensions and height are separate and confirmed during advance. Smaller stages require PMO production approval.
On a phone, swipe the stage diagram sideways to inspect each position.
Stage & access
- Stage cleared, swept and damp-mopped before arrival; smooth, seamless surface with no holes or protrusions.
- Keep required playing areas uncarpeted; confirm drum rug and riser areas during advance.
- Audience stairs are optional, to be agreed in advance.
- Review any orchestra pit or thrust with PMO. Where appropriate, seat a lowered pit or use a raised pit as part of the performance area.
Risers, stands & seating
- All risers and steps must be safely secured; final dimensions and heights to be confirmed.
- Confirm music stands and stand lights. The source request lists 15 Manhasset stands/lights; reconcile quantity with the final lineup.
- Provide backstage chairs; confirm performance stools, chairs and piano bench during advance.
Theater masking & communication
Main curtain may be used. A full set of legs and borders masks backstage and overhead areas. A smooth cyclorama is desirable; a black scrim 4–6 ft downstage of the cyc is desirable but not required. Provide Clear-Com-type communication, typically 6–8 stations, with final positions in the event pack.
02Input list 32 positions
| Ch. | Source | Mic / connection | Stand / notes |
|---|
03Monitor plan
| Mix | Position | Coverage / mix notes |
|---|
Wedge counts, IEM provision, mix sharing and stage placement must match the final event pack. IEM ownership and provision must be confirmed; the venue is not automatically responsible for supplying them.
04Backline request
Not included in print/PDF.
This section applies only when the presenter has offered to provide backline. Confirm the supplied items, approved equivalents and responsibility for any remaining equipment during the production advance. Optional items below are not automatic rental requirements.
20-piece show-specific backline · Jimmy’s 2026 sheet
- Four wireless microphones; assign channels, ownership and frequencies during advance.
- Small bass rig: 4×10 cabinet with 1,000-watt head — confirm with production.
- Small drum kit: 18″ kick, snare, 12″ rack tom, and 14″ or 16″ floor tom; hi-hat, timbales and two cymbal stands.
- Toys and cymbals are listed as provided; confirm the supplying party.
- Three IEM packs. Jimmy notes two packs can be provided if needed; confirm their source and the remaining pack.
These show-specific requests take priority over conflicting master-list kit and bass specifications for the 20-piece version. Confirm the full kit and any substitutions during advance.
Congas & timbales
- 3 LP Classic congas, 30″ tall: 11″, 11¾″ and 12½″, with stands.
- Timbales with stands: LP Tito Puente or Pearl Marc Quiñones.
- 1 red LP jam block, 1 salsa cowbell and 1 cha-cha cowbell.
Bongos & percussion
- LP Giovanni bongos with a stand for seated playing, plus a drum throne.
- Peruvian-style cajón, without strings or snares.
- Chimes.
Electric piano
88-key weighted-action instrument. Preferred choices, or approved equivalent:
- Roland FP-30X
- Yamaha P-225 88
- Kurzweil PC88
Do not substitute: Yamaha Motif, Nord, lightly weighted keyboards, or keyboards with fewer than 88 keys.
Bass & amplification
- Sendel baby bass (formerly Ampeg).
- Gallien-Krueger 700RB-II head with GK 4×10 cabinet.
- Aguilar DB751 is also acceptable; a single 15″ cabinet is also acceptable.
Confirm the supplied head/cabinet combination in advance.
Cymbals & hardware
Zildjian cymbals:
- 14″ A Custom hi-hats
- 18″ crash/ride
- 16″ crash
- 14″ splash
- Stands for all agreed hardware and cymbals.
The source also says “hardware with 2 cymbals.” Confirm the final cymbal package before ordering.
Optional drum kit
Only if confirmed at the advance meeting:
- Yamaha Maple Custom: 20″ / 12″ / 14″
- DW 5000 kick pedal
- 14″ × 6.5″ wood snare: Pearl Masters Complete
Optional grand piano
Only if confirmed at the advance meeting: Steinway Model B, not Model D. Confirm placement, tuning and microphone needs separately.
05Audio & power
PA & consoles
Stereo professional PA with even venue coverage. Source specification: 20 Hz–18 kHz, capable of 112 dB; confirm the system design and operating levels in the advance.
Source PA references: Meyer Milo / 700-HP, L-Acoustics, Adamson Y18, Martin Audio W8L/W8LC and JBL VerTec. Source amplification references: Lab Gruppen, Crown, Crest or QSC; matching amplification throughout.
FOH and monitor console preferences follow the newer small-band rider: Midas M32 / PRO series, Yamaha CL series, Allen & Heath, or Behringer X32. Analog consoles require Jimmy’s approval.
Distribution & stage supply
Source package: 32–56-channel snake with 12 returns, approximately 250 ft; 40-channel splitter with direct and transformer-isolated outputs; FOH fanout and 25–30 ft monitor fanout. Confirm venue-specific or digital equivalents during advance.
The venue supplies all stage boxes, sub-snakes, microphone stands, clamps, cables and DIs needed for the agreed patch, plus onstage power distribution and mains hookup.
Provide intercom and house playback at FOH. The 20-piece show uses 11 monitor mixes, including three IEM positions.
Analog consoles & outboard
Jimmy’s current rider requires approval for any analog console and its outboard equipment. Confirm the complete FOH and monitor package during advance; no legacy outboard inventory is assumed.
06Video & projection
OptionalPMO is developing visual content to complement selected performances. Where available, PMO welcomes the use of the venue’s existing rear-stage projection system, LED screen, or suitable in-house television displays.
Please advise during the production advance
- Available display equipment and its location, including whether it is visible to the audience during the performance.
- Screen dimensions, aspect ratio, and supported playback formats/connections.
- Whether the venue can provide playback equipment and an operator.
Rear-stage projection
Preferred for the performance backdrop. Confirm screen position, sightlines and interaction with stage lighting.
In-house televisions
May be considered for supporting visuals or PMO branding, depending on their placement and capabilities.
Use of visuals, content delivery, playback responsibilities, and testing time will be agreed upon before the event. Visual content is subject to availability and confirmation by PMO.
Optional. Subject to advance confirmation.
Video equipment is optional. No additional rental or expense is required unless separately agreed upon in writing. The performance can proceed without video.
07Lighting & schedule
Lighting
The venue supplies a professional lighting director. The source theater specification calls for a grid of at least 56 instruments, four distinct scenes, a separate colored front wash, and up to two followspot operators upon request. Smoke effects may be requested. Confirm the package and any venue restrictions in the advance.
Production schedule
Soundcheck is closed to audiences, students, donors, sponsors and press unless PMO consents in advance. No soundcheck recording is permitted.
Theater & touring wardrobe
One wardrobe person before soundcheck, typically 2–3 hours before the show, for pressing and steaming. Provide a workroom, professional steamer, iron, large ironing board and mending kit. Washer/dryer access is desirable; advance same-day dry cleaning as needed.
08Hospitality
Dressing rooms
Clean, smoke-free, temperature-controlled, lockable rooms, inaccessible to the public during the performance. Provide mirrors with lighting and chairs, tables or counters, costume racks/hangers, 2–3 full-length mirrors, private lavatory access, outlets and comfortable seating.
Source request: five dressing rooms accommodating three artists each, plus a production office with telephone, printer and internet. Confirm room capacity against the actual travel party.
Towels & accommodation
Non-theater dates: source request of 25 hand towels. Theater dates: three black hand towels and two bath towels per performer, plus soap.
When hotel accommodation is part of the engagement, the source preference is a four-star hotel with dining, 24-hour room service, lounge, bell service, fitness center and breakfast. Final single/double room counts must be confirmed; the source counts conflict.
Meals & beverages
One hot meal on show day, placed in a common area near the dressing rooms at the advanced time; typically 5:30 p.m. for an 8 p.m. performance. Keep the meal available through load-out. The source catering quantity is approximately 25 people; confirm actual musicians and crew for each configuration.
- Raw vegetables and dip, hot soup, green salad with two dressing choices.
- One meat entrée, one starch, one vegetarian dish and two hot vegetables.
- Whole fresh fruit plus cake, pie or cookies.
- Condiments, including salt, pepper, Tabasco and another hot sauce.
- Real dishes and flatware preferred; napkins, cups, clean ice, separate ice containers, trash bin, bussing trays and to-go containers.
- Regular and decaf coffee with milk/cream and sweeteners; assorted tea with hot water, honey and lemon.
- Regular/diet soft drinks; fresh fruit/vegetable juices, including coconut water.
- Bottled still water, some chilled and some room temperature; two large bottles of sparkling water with lime.
- 2% milk and organic soy milk.
- Source request: one case premium beer and four wine bottles (two red, two white).
Beverages available from load-in through load-out, replenished as needed. Source quantities differ between hospitality and catering (four versus three cases of still water); consolidate in the event advance and confirm dietary needs.
09Production coordination
This consolidated rider brings the ensemble’s stage, audio, lighting and hospitality information into one document. Confirm the event’s configuration, equipment substitutions and production schedule with PMO before finalizing the advance.
Production team
A minimum of two venue audio engineers: one FOH engineer to assist PMO’s engineer, and one monitor engineer / stage-audio technician. The venue provides a professional lighting director.
Advance coordination
Jimmy Goings · Production
jimmy@gfientertainment.com
650-465-8066
10Advance notes
These items remain open in the source material. Resolve them before issuing the final presenter PDF.
- Stage & risers: minimum and preferred stage footprints are listed with the stage plot. Confirm the venue’s clear usable area and 24-inch deck height; any smaller stage requires PMO production approval. Trumpet-riser dimensions and elevation above the deck remain subject to advance. The source documents contain differing riser sizes; agree the final riser arrangement with production.
- Travel & hospitality: resolve “three (5)” single rooms plus eight doubles; confirm room, meal, water and towel quantities for the actual travel party.
- Final event pack: confirm load-in, soundcheck, lighting adaptation, optional video availability, stands/seating and the final stage arrangement.
Source documents & revision basis
Primary technical sources supplied November 15, 2026: “2026 NEW INPUT LIST 20 PIECE BAND (1)-1.odt”; “PMO 13-14 PIECE INPUT LIST-1.docx”; “Pacific Mambo Orchestra SMALL GROUP TECH RIDER -1.docx”. Master backline preferences: “NEW PACIFIC MAMBO ORCHESTRA BACKLINE LIST.docx”. General production requirements follow Jimmy’s current small-band rider, extended to the full lineup as instructed. October 23 stage-placement directions and the legacy stage plot inform the working diagrams. Optional video wording is approved in this conversation. Stage dimensions added November 16, 2026: 13-piece dimensions supplied by Christian; full-band dimensions are planning recommendations for the current 20-piece layout, subject to event-specific production advance.
Original large-band stage plot · Original small-band stage plot
The schematic above is a newly organized working layout. Final stage placement is subject to production approval. Website photos and official logos: pacificmambo.com.
pacificmambo.com/for-presenters ↗
Pacific Mambo Orchestra · Revision November 15, 2026 · Final event requirements subject to advance.